Wind Park Saint Nikola 156 MW

 

Description
Wind Park Saint Nikola 156 MW is the biggest one in Bulgaria and includes the following facilities: 52 Vestas V90 Wind generators with foundations, crane pads, roads; Underground 33 kV electricity cables and optical cables from the turbines to the Substation, combined in 8 branches; Substation Saint Nikola 33/110 kV, 2×100 MVA Transformers; 110 kV Overhead Power Line from the Substation Saint Nikola to the National power transmission system

Information at EBRD site: http://www.ebrd.com/work-with-us/projects/esia/saint-nikola-wind-farm.html

CLIENT
AES Geo Energy OOD

SCOPE OF SERVICES

Technical Control of the Design, part Structural
Design Conformity Assessment of the Basic and Technical Design Documents as per Art. 142 (5) of SDA
Construction supervision per Art. 168 of SDA
Preparation of Technical Passport per Art. 176a of SDA
Coordination procedures and approval of investment design
Geodetic survey and processing data to the Cadastre Agency by a licensed person in compliance with the Cadastre and Property Register Act