EQE Control
Menu
    • Home
    • About us
    • Scope of services
    • We are proud of
    • FIDIC
    • Contact us
    • BG

    Energy

    Nuclear Power Plants

    Nuclear Power Plants

    Wind Parks

    Wind Parks

    Photovoltaic Plants

    Photovoltaic Plants

    Overhead Power Lines

    Overhead Power Lines

    Thermal Power Plants

    Thermal Power Plants

    Hydro Power Plants

    Hydro Power Plants

    UBB Affiliate Program

    UBB Affiliate Program

    Back
    01 ТЕЦ (2)

    Harmanli Regional Solid Waste Landfill, Sorting Facility

    19.03.2021

    PROJECT

    Harmanli Regional Solid Waste Landfill, Sorting Facility

    Description

    The constructed Sorting facility at Harmanli Regional Solid Waste Landfill has annual capacity of 25 000t at facility entry

    CLIENT
    Harmanli Municipality

    SCOPE OF SERVICES

    Design Conformity Assessment in compliance with SDA
    Construction supervision per SDA
    Investment Control
    Preparation of Technical Passport per SDA
    Preparation of Final Report and preparation of documentation for Commissioning

    01 ТЕЦ (2)

    Non-hazardous wastes landfill

    19.03.2021

    PROJECT

    Transportation and Disposal of Ash and Gypsum from AES 3C Maritza East 1 Power Plant, Dryanovo Landfill, Galabovo Municipality, District Stara Zagora

    Description

    The new lignite-fired AES Maritza East 1 (Galabovo) Thermal Power Plant produces approximately 3,2 million tons of combustion waste per year (from the combustion of the lignite in the power plant and dewatered waste from the wet limestone flue gas desulphurization (FGD) units). The combustion waste is transported to the Dryanovo Landfill Site for disposal. The project includes Design, Supply and Construction of Waste Disposal Facility consisting of three major elements – Transportation, Disposal and Water management and includes 40 subsites

    CLIENT
    AES Maritsa East 1 EOOD

     SCOPE OF SERVICES
    Technical Control of the Design, part Structural

    Design Conformity Assessment of the Basic and Technical Design
    Coordination procedures and approval of investment design
    Construction supervision per SDA
    Final Report to National Construction Control Directorate

    05 Кокаляне DSC03540 (2)

    HPP Passarel, HPP Kokalyane, HPP Germanea and HPP Yahinovo

    19.03.2021

    PROJECT

    HPP Passarel, HPP Kokalyane, HPP Germanea and HPP Yahinovo

    Description

    HPP Passarel is one of the basic power generating unit of the Iskar Cascade. The plant is equipped three Francis type Turbines, two Generators with power capacity 14 MW each, 10,5 kV and one generator with power capacity 2,6 MW

    HPP Kokalyane is one of the basic power generating units of the Iskar Cascade. The plant is equipped with two Francis type Turbines and two Generators with power capacity 11,2 MW each

    HPP Germanea is run-of-river Power generating Hydro Plant. Water intake is located on Germanea River. The plant is equipped with one Pelton type Turbine one Generator with power capacity 3,3 MVA

    HPP Yahinovo is located on the penstock 2 supplying water to the Dyakovo dam. The plant is equipped with one Francis type Turbine one Generator with power capacity 7,66 MVA

    CLIENT
    AKUO ENERGY France

    SCOPE OF SERVICES

    Technical due diligence report covering the following key topics:
    Ability of the project to generate the expected power and energy
    Assessment of the power generating equipment
    Status of various licenses and permits and conditions associated to their granting
    Assessment of technical requirements contained in permits and approvals (environmental, water usage, grid connection…)
    Review of natural resources conditions (hydrology study and potential) and calculation of long-term series (flow duration curves) and uncertainties (P50, P75, P90)
    Preparation of Hydrology study report of the 4 HPPs: Passarel, Kokalyane, Yahinovo and Germanea
    Review of the contractual framework (all major contracts – Operation and Maintenance, Power Purchase Agreement, electricity trading agreement, etc.).  Review of all guarantees of the equipment, comparison to the market benchmarks
    Review of the financial model and opinion on the major assumptions
    Inspection of the HSE rules

    01 ТЕЦ (2)

    TPP AES Galabovo

    19.03.2021

    ОБЕКТ
    ТЕЦ Гълъбово с мощност 2х300 MW

    PROJECT

    TPP AES Galabovo with capacity 2х300 MW

    Description

    FIDIC Silver Book. Construction supervision on Design, Supply of equipment, Works, Testing and Commissioning of TPP with 2 thermal power units 300 MW each, includes over 80 sub sites

    Supervised works include the following sub-projects and main activities:

    Turbine Halls
    Construction of power facilities
    Construction of water facilities
    Construction of communication facilities
    Construction of Main Switchgear and Control Building
    Construction of Electrostatic Precipitators Control Building
    Construction of Desulphurization building
    Construction of Coal Unload, Storage & Transfer Area
    Construction of Water Treatment Plant
    Construction of Sewage Treatment Plant
    Construction of Ash Handling Silos & Buildings
    Construction of Cooling Tower & Pump Station
    Construction of Fuel Oil Transfer System
    Construction of Technical and Non-technical Auxiliary buildings
    Procurement, Installation and hydraulic tests of Boilers
    Procurement, installation and testing of mechanical equipment – Turbosets, Condensers, Pressure equipment, Electrostatic precipitator, Feedwater pumps, Preheaters, etc.
    Electrical and I&C works

    Information at EBRD web: http://www.ebrd.com/work-with-us/projects/psd/maritza-east-i-power-company.html

    CLIENT
    AES Maritsa East 1 EOOD

    SCOPE OF SERVICES
    Technical Control of the Design, part Structural
    Design Conformity Assessment of the Basic and Technical Design Documents
    Coordination procedures and approval of investment designs
    Construction supervision per Art. 168 of SDA
    Preparation of Technical Passport

    01 20191017_142841 (2)

    Overhead Powerline 400 kV from substation Maritsa East to substation Burgas

    19.03.2021

    PROJECT

    Construction of Overhead Powerline 400 kV from substation Maritsa East to substation Burgas

     

    Description

    OHL 400 kV from substation “Maritsa East” to substation “Burgas” with length 133 km, 418 poles with height from 32 m to 52 m. OHL trace passes through territories of the following disctricts: Stara Zagora, Haskovo, Yambol, Burgas

    CLIENT
    Electricity System Operator (ESO) EAD

    SCOPE OF SERVICES

    Design Conformity Assessment during all design phases
    Construction supervision per Art. 168 of SDA
    Investment control
    Reporting
    Control of the environment protection during the construction works in compliance with the Environment Protection Act and Waste Management Act
    Preparation of Technical Passport
    Assistance to the Client for Commissioning

    01 IMG_2434_Vratsa (2)

    Photovoltaic Plants

    19.03.2021

    PROJECT

    Construction of 7 PV Plants owned by Samsung C&T Corporation

    Description
    Turn-key project under FIDIC EPC Conditions of Contract, FIDIC Silver Book, Contractor: Schneider Electric for the construction of the following PVP: Agriplam 4 MW; Manageproject 4 MW; Fishtrade 4 MW; Solar Park 2 MW; Ecoenergy Solar 10 MW; Ecosolar 15 MW; Veselinovo Energy 4 MW

    CLIENT
    Samsung C&T Deutschland GmbH – Bulgaria

    SCOPE OF SERVICES

    Project Management
    Technical Control
    Design Conformity Assessment during all Design phases, including support to the Client in Obtaining Authority approvals
    Construction Supervision, including Support in obtaining Authority approvals and State Acceptance Commissioning as per SDA
    Preparation of Technical Passport
    Preparation of Final Report
    Technical Consultant during Operation
    Monitoring of the Operation and Maintenance Contract

    01 ВЕП Св Никола (2)

    Wind Park Saint Nikola

    19.03.2021

    PROJECT

    Wind Park Saint Nikola 156 MW

     

    Description
    Wind Park Saint Nikola 156 MW is the biggest one in Bulgaria and includes the following facilities: 52 Vestas V90 Wind generators with foundations, crane pads, roads; Underground 33 kV electricity cables and optical cables from the turbines to the Substation, combined in 8 branches; Substation Saint Nikola 33/110 kV, 2×100 MVA Transformers; 110 kV Overhead Power Line from the Substation Saint Nikola to the National power transmission system

    Information at EBRD site: http://www.ebrd.com/work-with-us/projects/esia/saint-nikola-wind-farm.html

    CLIENT
    AES Geo Energy OOD

    SCOPE OF SERVICES

    Technical Control of the Design, part Structural
    Design Conformity Assessment of the Basic and Technical Design Documents as per Art. 142 (5) of SDA
    Construction supervision per Art. 168 of SDA
    Preparation of Technical Passport per Art. 176a of SDA
    Coordination procedures and approval of investment design
    Geodetic survey and processing data to the Cadastre Agency by a licensed person in compliance with the Cadastre and Property Register Act

    01. P1040548

    NPP Kozloduy

    19.03.2021

    PROJECT

    Design and construction of Facility for size reduction and deactivation of materials

    Description
    Facility for size reduction and deactivation of materials is located in a monolithic building divided in functional zones within the NPP Kozloduy area. Built-up area of the building 2 537 sq.m, Total Built-up area 3 039 sq.m

    CLIENT
    State Enterprise Radioactive Waste (SE RAW)

    SCOPE OF SERVICES

    Construction Supervision, in compliance with art. 168 of SDA
    Reporting and providing technical and financial information
    Investment Control
    Health and Safety Coordinator
    Tracking of Time Schedule
    Preparation of Technical Passport

    Посолството на Федерална република Германия в София

    21.01.2021

    ОБЕКТ

    Управление на проект (Проджект мениджмънт), Управление на бюджета и Консултантски и Инженерни услуги по проект: Изграждане на нова административна сграда на Посолството на Федерална република Германия в София (България)

    Описание на обекта

    Новa административна сграда на Посолството на Федерална Република Германия в София.

    ВЪЗЛОЖИТЕЛ

    Агенция за Федерално строителство

    ОБХВАТ НА ДЕЙНОСТИТЕ

    Консултантските и инженерни услуги по Бялата книга на ФИДИК, пето издание от 2017 година по управлението на проект за Проектиране, Строителство и Въвеждане в експлоатация по Сребърна книга на ФИДИК, Първо издание от 1999 година.

    Жилищно административна сграда, гр. Свищов

    21.01.2021

    ОБЕКТ

    Договор за Консултантски услуги: Оценка на съответствието и строителен надзор на строеж: Жилищно административна сграда, гр. Свищов

    Описание на обекта

    Сградата е решена в класически стил характерен за Свищовската архитектура от началото на XX век. Сградата се намира срещу централния градски парк. Сградата е решена на 7 нива от юг и 6 нива от север с РЗП= 3690.25м2. В северната част са поместени две нива с административни функции. Над тях има 4 нива жилищна част.

    ВЪЗЛОЖИТЕЛ

    Екотекника АД

    ОБХВАТ НА ДЕЙНОСТИТЕ

    Технически контрол на проекта

    Оценка на съответствието на инвестиционния проект

    Упражняване на строителен надзор на строежа

    Изготвяне на Окончателен доклад и Технически паспорт

    1 2 3 4 5


    Преглед на по-голяма карта